The Safetyvalue Trading CenterIowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-05-07 03:15205 view
2025-05-07 01:522077 view
2025-05-07 01:252375 view
2025-05-07 01:24706 view
2025-05-07 00:5484 view
2025-05-07 00:472604 view
The ad hoc Department of Government Efficiency team is assigning two staffers to work at the indepen
The products featured in this article are from brands available in NBCUniversal Checkout. E! makes a
Shark attack survivor Bethany Hamilton is thankful for the outpouring of support amid a heartbreakin